Skip to main content

Project Directory

Welcome to the Project Directory page where you can learn more about current and completed City projects.

Map showing projects completed with Measure F-14 funds.
Roads - Measure F-14
Measure F-14 Road Projects

In 2014, Atascadero voters approved a ballot measure (F-14) which authorized the City to increase its sales tax rate by a ½ percent for a term of 12 years, together with a measure (E-14) advising

Plans for the Del Rio Marketplace Project
Mixed-Use
Del Rio Marketplace

The Del Rio Marketplace project is anchored by a full service market, restaurants and a distillery. The surrounding buildings will be filled with a bustling job center including flexible work

Dove Creek Mixed-Use project concept art.
Mixed-Use
Dove Creek Commercial

The Dove Creek Commercial Development serves as our community gateway from the south. This mixed-use project includes a community gathering space surrounded by family friendly marketplace with

Santa Lucia Bridge during construction - preparing the wood deck for concrete.
Bridges
Santa Lucia Bridge Project

Project Summary:
Full bridge replacement and roadway approach improvements.
New bridge structures will be widened to meet current standards and safety regulations.

Lift Station 13 Project Map
Wastewater
Lift Station #13 and Force Main Replacement Project

This project involves replacing Wastewater Lift Station #13 and constructing approximately 2 miles of force main pipe between El Camino Real and Orillas Way below Santa Cruz Road and Traffic Way

Downtown Paving project work
Roads
Downtown District Pavement Rehabilitation Project

As part of the City Council’s Key Priorities, the City of Atascadero has approved the Downtown District Pavement Rehabilitation Project.  The project will include

Atascadero Pit Stop project
Commercial
Atascadero Pit Stop

The applicant proposes a fueling station with deli and market. The fueling station is designed with 12 gasoline pumps and 9 electric vehicle charging stations. The design is styled after Googie

Barrel Creek project map.
Mixed-Use
Barrel Creek

This mixed-use development will showcase Atascadero as a "maker's space" with artisan goods, craft beer and entertainment. This project includes a 120 room hotel and outdoor space. The adjacent

Via Bridge replacement project under way.
Bridges
Via Avenue Bridge Project

Project Summary:
Full bridge replacement and roadway approach improvements.

Project Location:
Via Avenue over Atascadero Creek.

Concept drawing for downtown project reconfiguration.
Infrastructure
Downtown Atascadero Infrastructure Enhancement Plan

The Downtown Infrastructure Enhancement Project is currently in the final design phase. The project is fully funded and will be constructed in 2024. For questions about the project, please call

General Plan Update Logo
Outreach
General Plan Update

The General Plan Update will shape how our city might change over the next 20 years. The General Plan is a comprehensive policy document that provides the general

Ten850 Planned Development
Residential
Ten850 Planned Development

The proposed project consists of a total of 75 unit residential units that includes:

  • 48 independent living, senior apartments at a total of 3-stories in height;
  • 20 attached
Atascadero Lake Park Pier and pathway improvements.
Pedestrian & Bicycle
Lake Park Pier and Pedestrian Pathway Project

Project Summary:
The City received grant funding to repair and improve pedestrian access on the Atascadero Lake Park Pier and adjacent sidewalk. Atascadero Lake Park is a