Interior demolition continued at the basement level, removing existing block walls and unreinforced concrete slab.  Exterior exploratory excavations will begin early next week to determine the actual conditions of the building foundations.  Exploratory footing excavations at the interior basement level will also commence next week following the removal of all concrete debris.  The explorations are needed to confirm the actual condition of the foundations, and determine the design parameters for the micro pile systems for structure stabilization.  Other upcoming activities include removal of existing ADA access ramp, removal of exterior basement access ramp, asphalt, and concrete aprons.

 