Programmed Capital Projects with ADA components/improvements

12/14/2016

Name/Description Status ADA Component(s)
CDBG South El Camino Real Sidewalk Infill Construction 1000' Sidewalk Infill; Replace ADA Curb Ramp and Signal Equipment
CDBG Atascadero Mall Sidewalk Infill Design 300' Sidewalk Infill; Replace non-compliant ADA Curb Ramps and Driveway Approaches and Install new ADA Curb Ramps
CDBG Traffic Wall ADA Improvements 2017/2018 Replace non-compliant ADA Curb Ramps, Driveway Approaches and Sidewalk
ECR Pavement Rehabilitation Design 300' Sidewalk Infill @ 3400 ECR.  Addition of this sidewalk section will complete sidewalk on south side of ECR from San Anselmo to San Benito Road.
FY 2015/2016 F-14 Pavement Rehabilitation Construction Replace non-compliant sidewalk and curb ramps on San Andres Road.
Via Avenue Bridge Replacement Design Bridge Replacement includes new sidewalk to connect Via Ave. to Ensenada Ave.
Zoo Garden Event Center Design Includes ADA compliant pedestrian pathways and reconstruction of portion of existing parking area for ADA parking spaces.
Highway 41 Multi-Purpose Pathway Construction Installation of 1/2 mile of ADA compliant pathway; replacement of non-compliant Curb Ramps at adjacent intersections.
Centennial Bridge and Plaza Project Design Construction of pedestrian facilities, including walking paths, bridge and plazas.  Existing non-compliant parking area and sidewalks to be replaced with ADA compliant facilities.
ALPS Trailhead and Parking Lot Construction Construction of ADA parking facilities and pathway to adjacent ALPS Trailhead.